Tub to Shower Conversion in Montreal: Cost, Condo Rules and Options

Updated November 18, 2026 by Fabio Freire, Freire Management (RBQ 5647-0479-01)

Replacing the tub with a walk-in shower is the bathroom job we're asked about most. It frees up space, makes the room easier to use and clean, and changes how the whole bathroom feels. Here is what it costs in Montreal and on the South Shore, the choices that change the price, and what to know if you live in a condo.

What a Tub to Shower Conversion Costs

Turnkey, labour and materials included, before tax:

  • Shower area only (the floor, vanity and toilet stay): from about $10,000.
  • Recent condo conversions we quoted: about $13,000 to $15,000, depending on a prefab base or a custom tiled base.
  • Conversion as part of a full bathroom (new floor, vanity and toilet too): usually from about $18,000.
  • Curbless shower with a linear drain: more, because the floor has to be rebuilt to slope into the drain.

Our quotes include budgets for the base, tile, glass and fixtures you choose, so the price follows your selections. See the full breakdown in what a bathroom renovation costs.

Tub replaced by a curbless walk-in shower in a Brossard bathroom
In this Brossard bathroom, the tub became a curbless shower with a linear drain

The Choices That Change the Price

Prefab Base or Tiled Base

A prefab acrylic base is faster and costs less. A tiled base, built on a waterproofing system, lets the floor tile run into the shower and can be any size. Both work when they're installed properly.

Curb or Curbless

A low curb is the standard. A curbless shower, where the floor runs straight in with no step, looks cleaner and is easier for anyone with limited mobility, but it needs floor work and a linear drain. Read more about curbless showers.

Glass

A single fixed panel is the simplest and most open. A sliding door keeps more water in. Frameless glass costs more than framed but is easier to clean.

Tile and Niches

Large-format porcelain means fewer grout lines and a calmer look. A recessed niche built during the tile stage replaces shower caddies for good.

What's Behind the Tub

Old valves, a drain in the wrong spot or water damage under the tub are common in older homes. A good quote tells you how these are handled before the work starts.

How Long It Takes

A shower area alone is usually faster than a full bathroom, which takes about two weeks of work. Glass is measured after the tile is done, so it's usually the last thing installed. You get an approximate written schedule after the visit; nobody can promise an exact date before the tub comes out.

Condos: What to Plan For

  • Approval. Many condo syndicates want to know about the work before it starts, especially anything touching plumbing or the floor. Check your declaration of co-ownership and building rules.
  • Floor and drain. In a concrete building, how far the drain can move depends on the slab. A curbless shower is not always possible.
  • Noise and hours. Buildings set working hours and often ask for an acoustic membrane under new tile.
  • Elevator and protection. Common areas have to be protected and elevators booked.

These are why condo work costs about 15% more. Read our guide to condo bathroom renovations.

Should You Remove the Only Tub in the House?

If you have young children, or you plan to sell soon to families, keeping one tub somewhere in the house is usually wise. In a two-bathroom home, the common answer is a walk-in shower in the primary bathroom and a tub in the other. See walk-in shower vs bathtub.

Frequently Asked Questions

How Much Does It Cost to Replace a Tub with a Shower in Montreal?

From about $10,000 before tax for the shower area alone, turnkey. In a condo, recent conversions we quoted were around $13,000 to $15,000.

Do I Need a Permit to Replace a Tub with a Shower?

It depends on your city and on whether plumbing moves. We check and take care of the permit when the job needs one.

Can Every Tub Become a Curbless Shower?

Not always. It depends on the floor structure and, in condos, on the concrete slab. We check it at the visit.

Get a Price for Your Conversion

Book a free onsite visit or get a price range in 60 seconds. You can also call (438) 255-2501.

Ready When You Are.

Tell us about your bathroom in 60 seconds and pick a time for your free onsite visit.

Book My Free VisitGet My Price in 60 Seconds

Free onsite visit · Detailed written quote · No obligation