Short answer: replacing finishes usually doesn't need a permit, but moving walls, changing the layout or touching the structure does. Plumbing and electrical work must be done by licensed trades either way. The details depend on your city, so here is how it works in Montreal and on the South Shore.
Montreal
The City of Montreal says minor cosmetic work, like new flooring, paint, cabinets and counters, or replacing a sink or a tub, can be done without a permit. A permit is needed when the work touches walls or foundations, changes the structure, increases the floor area, or changes the size, division or use of rooms (montreal.ca). Each borough can add its own rules, so the borough's page has the final word.
The City no longer issues permits for plumbing or electrical work. That work falls under provincial rules and must be done by contractors licensed by the Régie du bâtiment du Québec (RBQ).
Brossard
Brossard has an interior renovation permit (réaménagement intérieur) on the same application form used for additions and major renovations, sent to the city's planning department (brossard.ca). If you are changing the layout of the bathroom or opening walls, plan for one.
Longueuil, Saint-Hubert and Greenfield Park
Longueuil takes permit applications online through its online permit service. Some areas fall under a site planning and architectural integration plan (PIIA), which mostly affects exterior work.

Usually No Permit
- New tile on the same walls and floor.
- A new vanity, toilet, sink or tub in the same place.
- Paint, mirrors, lights on existing boxes.
Usually a Permit
- Moving or removing a wall, or making the bathroom bigger.
- Turning a powder room into a full bathroom, or adding a bathroom in the basement.
- Structural work, like cutting joists to build a curbless shower.
Condos Have a Second Set of Rules
Even when the city doesn't ask for a permit, most condo syndicates want to approve the work first, especially anything touching plumbing, the floor or soundproofing. Read our condo bathroom guide.
What If You Skip It?
Work done without a required permit can bring a fine, an order to redo the work, and questions from your insurer or a future buyer. It's rarely worth the risk.
How We Handle It
We check what your city requires at the quote stage and take care of the permit when the job needs one. Our plumbing and electrical work is done by licensed trades. Freire Management is licensed and insured, RBQ 5647-0479-01.
Frequently Asked Questions
Do I Need a Permit to Replace My Tub with a Shower?
Often not, if the drain and walls stay where they are. If walls move or the floor structure changes, check with your city first.
How Long Does a Permit Take?
It varies by city and season. A complete application with clear plans moves fastest.
Start with a Free Visit
Book a free onsite visit or get a price range in 60 seconds. You can also call (438) 255-2501.



